Project Description
PT PLN (Persero), through its subsidiary, PT PLN Nusantara Power, supports the Government’s commitment to reducing greenhouse gas emissions as outlined in Regulation No. 16 of 2016. PT PLN Nusantara Power is focusing on large-scale solar PV power projects, including 50 MWc Ground Mounted PV in Central Java, respectively, Batang region and Pemalang region. Following the approval of the pre-FS documents issued in 2023, to proceed with the project to the next step, Basic Engineering Design (BED) and bid documents to select their partners to develop the project were being prepared. Synkrona Enjiniring Nusantara (SEN), through PT Surveyor Indonesia, develops the BED and bid documents, ensuring compliance with technical, environmental, and regulatory standards.
Project Detail
LOCATION
Batang & Pemalang (Central Java)
CLIENT
PT Surveyor Indonesia
PROJECT DURATION
2024-2025