As pln’s integrator and main contractor, Syntek Energy & Control managed to present a light in Ngadulanggi Village, after successfully building a source of electrical energy that has long been coveted by villagers. PLTS Off Grid 130 kWp battery storage capacity of 288 kWh was built to meet the electricity needs of the people there. There are at least 200 heads of families who until now have not been touched by electricity can finally enjoy electricity to support their daily activities. Electricity has become a basic need for rural communities, especially to move the wheels of the economy so that equalization must be sought. Syntek Energy & Control is very proud to be able to provide the best with its professional expertise in building off grid solar plants. We will continue to support the government in efforts to develop sustainable energy to the 3T (Foremost, Lagging and Outermost) areas to realize equitable energy to remote parts of the archipelago.

Project Detail

LOCATION
NTT

CLIENT
PT PLN (Persero)

PROJECT DURATION
2021

Share is caring

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on whatsapp
WhatsApp
Share on telegram
Telegram
Share on email
Email

Related Project

Project Category

Energy Economics

Electrical Power System Study

Assessment, Engineering Design & Construction Management